All our articles
Installing a pool kit: practical advice
The panels, along with their supports, form the structure of the pool. The openings for skimmers, lighting, and return inlets are either pre-cut at the factory or must be made on-site by the installer.
These elements are essential to ensure the overall structural integrity against ground pressure and the force of the water against the walls.
Nuts and bolts for securing panels and supports, steel bars.
Skimmer (suction), main drain (bottom drain) and return inlets for water circulation.
Projectors and pool lighting devices must generally be installed during the structural setup phase.

Pool marking and excavation:
Tape measure, string, small nails, 2 x 5 cm wooden stakes, marking spray paint, bubble level or mason’s level and leveling rod, 1.20 m level, shovels, pickaxes, measuring tapes, 25 cm metal stakes, plumb bob.
Assembly of steel panels and other elements
Concrete pouring and finishing
For the liner
Next step:
Pool marking and excavation
Products for professionals at the best price for everyone
Delivery by Colissimo and within 48 hours for in-stock products
Secure transactions by Credit card, PayPal and bank transfer
No account yet?
Create an Account